    Practice Putting Green Sprinkler with poor distribution uniformity.
    previous next
    Practice Putting Green Sprinkler with poor distribution uniformity.
    Existing West Pump Station
    Practice Putting Green Sprinkler with poor distribution uniformity.
    Hole #6 Catch Basin Rebuild - Before
    Hole #6 Catch Basin Rebuild - In Process
    Hole #6 Catch Basin Rebuild – Completed
    Hole #1 Catch Basin Rebuild – Before
    Hole #1 Catch Basin Rebuild – Completed
    Hole #4 Concrete Cart Path Repair
    Hole #9 New Asphalt Cart Path
    Hole #12 New Asphalt Cart Path - Completed May 16, 2025
    Hole #16 New Asphalt Cart Path - Completed May 2, 2025
    Hole #17 Green Tee Box – Completed mid-June 2025
    Hole #17, Red and Black Tee Box, has been expanded, leveled, and sodded, with a 1500-square-foot tee-able area.
    Hole #17 Green Tee Box – Completed mid-June 2025
    Hole #17 Green Tee Box—expanded, leveled, and sodded. There is now 1,200 square feet of tee-able area.
    Bunker Rebuild – Hole #17
    Tree Planted on a Hill
    Hole #14 Pond – Fall 2024
    Hole #14 Pond – Spring 2025
    Husquvarna Robotic Mower
    Turflogic Hole #6 on June 5, 2025
    Turflogic Hole #6 on September 11, 2025
    Turflogic Hole #13 on June 5, 2025
    Turflogic Hole #13 on September 11, 2025