East Dartmouth Ave. Traffic Calming

Share East Dartmouth Ave. Traffic Calming on Facebook Share East Dartmouth Ave. Traffic Calming on Twitter Share East Dartmouth Ave. Traffic Calming on Linkedin Email East Dartmouth Ave. Traffic Calming link

Project Overview

Dartmouth Ave. between Broadway and University Blvd. is a collector street that includes intersections with higher-than-normal crash rates in the city of Englewood. This segment is also a major bicycle and pedestrian corridor throughout the city. The City applied for a Federal Highway Safety Improvement Project Fund grant through the Colorado Department of Transportation (CDOT) and was awarded $1,080,000 to investigate and construct improvements to address these safety concerns.

The primary goals of this project are to reduce crashes at the currently signalized intersections at S. Logan St. and S. Downing St. and enhance the overall multi-modal safety throughout the project area. To meet these goals, the city is installing the following improvements.

  • Fully reconstruct the S. Logan St. and S. Downing St. intersections and replace with mini-roundabouts.
  • Install paint and post intersection improvements along the corridor to create smaller turning radii for vehicles as well as protect cyclists and pedestrians with vertical elements.

Other minor traffic calming and complete street design elements are included within the project area to support the overall goal of this project. The City has contracted with the engineering firm Consor Engineers, LLC (formerly Apex Design) to perform the design of the corridor.

Project Location

Project Intersections

S. Logan St. Mini Roundabout


S. Downing St, Mini Roundabout
S. Sherman St. Bulbouts
Project Schedule

City staff, along with our consultant, is working to secure the necessary CDOT clearances to advertise the project for construction bids. This includes obtaining environmental clearance, utility clearance letters and right-of-way clearance. The city plans to advertise the project for construction in summer 2025.

Project Funding

This project has two sources of funding: Federal Highway Safety Improvement Project Fund and the City of Englewood Public Improvement Fund. The funding breakdown is as follows:

$1,958,000 (Federal HSIP) + $652,000 (City of Englewood) = $2,610,000


Provide Your Feedback

The City of Englewood is developing a corridor safety project on Dartmouth Avenue between South Broadway and University Boulevard. Your feedback on the project is very important and will inform the final design. To provide input and learn more about the project background, and proposed safety improvements, please click here.

Project Overview

Dartmouth Ave. between Broadway and University Blvd. is a collector street that includes intersections with higher-than-normal crash rates in the city of Englewood. This segment is also a major bicycle and pedestrian corridor throughout the city. The City applied for a Federal Highway Safety Improvement Project Fund grant through the Colorado Department of Transportation (CDOT) and was awarded $1,080,000 to investigate and construct improvements to address these safety concerns.

The primary goals of this project are to reduce crashes at the currently signalized intersections at S. Logan St. and S. Downing St. and enhance the overall multi-modal safety throughout the project area. To meet these goals, the city is installing the following improvements.

  • Fully reconstruct the S. Logan St. and S. Downing St. intersections and replace with mini-roundabouts.
  • Install paint and post intersection improvements along the corridor to create smaller turning radii for vehicles as well as protect cyclists and pedestrians with vertical elements.

Other minor traffic calming and complete street design elements are included within the project area to support the overall goal of this project. The City has contracted with the engineering firm Consor Engineers, LLC (formerly Apex Design) to perform the design of the corridor.

Project Location

Project Intersections

S. Logan St. Mini Roundabout


S. Downing St, Mini Roundabout
S. Sherman St. Bulbouts
Project Schedule

City staff, along with our consultant, is working to secure the necessary CDOT clearances to advertise the project for construction bids. This includes obtaining environmental clearance, utility clearance letters and right-of-way clearance. The city plans to advertise the project for construction in summer 2025.

Project Funding

This project has two sources of funding: Federal Highway Safety Improvement Project Fund and the City of Englewood Public Improvement Fund. The funding breakdown is as follows:

$1,958,000 (Federal HSIP) + $652,000 (City of Englewood) = $2,610,000


Provide Your Feedback

The City of Englewood is developing a corridor safety project on Dartmouth Avenue between South Broadway and University Boulevard. Your feedback on the project is very important and will inform the final design. To provide input and learn more about the project background, and proposed safety improvements, please click here.

  • East Dartmouth Avenue Safety Improvements Update – May 2025

    Share East Dartmouth Avenue Safety Improvements Update – May 2025 on Facebook Share East Dartmouth Avenue Safety Improvements Update – May 2025 on Twitter Share East Dartmouth Avenue Safety Improvements Update – May 2025 on Linkedin Email East Dartmouth Avenue Safety Improvements Update – May 2025 link

    City staff, along with our consultant, is working to secure the necessary CDOT clearances to advertise the project for construction bids. This includes obtaining environmental clearance, utility clearance letters, and right-of-way clearance. The city plans to advertise the project for construction in summer 2025.

Page last updated: 02 May 2025, 10:41 AM