April 25, 2024 Update
Over the last several months, Englewood staff and the design team from Jacobs Engineering have been gathering field data, evaluating system hydraulics, and finalizing the design for the City Ditch Piping Project. As this evaluation continued for Reach 4, it was found that the initial preferred pipeline route had several barriers for construction and operation of the ditch. The pipeline alignment has been modified to generally follow the existing City Ditch alignment between S Windermere St. and the Allen Water Treatment Plant.
The redesign for this reach is in its early stages, and additional field investigation is required. Over the coming weeks, our contractors will be locating utilities and taking soil bore samples near City Ditch in Belleview Park and W Layton Ave. The contractors and their vehicles/equipment will remain within the existing City of Englewood easements, on the City of Englewood property, or within the public right-of-way. The work will be for a short duration at each location and noise will be minimal.
We appreciate your understanding and patience as we complete the design phase of this critical project for Englewood’s drinking water system. We will continue to post project updates to the Englewood Engaged page as they become available. In the meantime, if you have any questions or would like to discuss this project further, please feel free to contact us at CDPipingProject@englewoodco.gov.

Thank you for your contribution!
Help us reach out to more people in the community
Share this with family and friends